No Detail Found!

Design, simulation, and verification of a PLC-based sequence modification for enhancing dome valve reliability in ash handling systems

Author(s)
Kent Martin D. Cartagena Bluewaters Power Station, Boys Home Rd, Collie WA, Australia
Consorcio S. Namoco Jr. University of Science and Technology of Southern Philippines, Cagayan de Oro City, Philippines
Abstract
In circulating fluidized bed (CFB) coal-fired power plants, dome valves play a critical role in regulating the flow of abrasive fly ash during ash handling operations. However, the harsh operating environment, characterized by high pressure and particulate abrasiveness, frequently leads to premature failure of rubber seals, resulting in leakage, reduced operational efficiency, and increased maintenance downtime and costs. This study presents the design, simulation, and field verification of a modified control sequence aimed at mitigating these issues by improving the timing of valve actuation. The proposed modification introduces a directional valve and integrates a programmable logic controller (PLC) based delay mechanism to ensure depressurization of the rubber seal prior to dome valve opening. Simulation of the control logic was conducted using a workshop-built PLC simulator configured with actual Allen-Bradley ControlLogix components. Field verification involved the installation of the modified system and subsequent testing over multiple operational cycles to assess performance consistency. Results confirmed that the modified sequence effectively delayed the opening of the diversion valve, enabled complete pressure release in the rubber seal, and prevented mechanical stress and leakage. No errors or faults were detected in the PLC system, and all installed components, including directional valves, relays, and sensors, operated reliably. The improved sequence demonstrated a promising solution for extending rubber seal life, reducing maintenance frequency, and enhancing overall system reliability in industrial ash handling applications.
Publication Details
Page(s) 1307-1315
DOI DOI not available
Published Journal: ARPN Journal of Engineering and Applied Sciences, Volume: 20, Issue: 16, Year: 2025

Request the full text from PASTIC

Keywords
reliability engineering, dome valve, CFB power plant, industrial automation, rubber seal, PLC modification, ash handling system
References
Maoui Azzi A.,Fatu A.,Souchet A.,D. A. .2019 .. , : .
International Tribology . .. , 135 : 432-443.
Conte M.,Manuello Bertetto A. .2019 .. , 03 : .
and Raparelli T. .2018 .Indirect contact pressure evaluation on pneumatic rod seals. Tribology International, 118 : 240-245.
Tran X.-N.,Tay K.,Yang Z.,Wang W.,Zeng H.,G. H.,Boon Z.,Subbaiah S. K.,P. S. K. .2018 .Modeling of ash formation and deposition processes in coal and biomass fired boilers: A comprehensive review. Applied Energy, 230(7) : 1447-1544.
Feyzullahoğlu E. .2015 .Abrasive wear, thermal and viscoelastic behaviors of rubber seal materials used in different working conditions. Proceedings of the Institution of Mechanical Engineers, Part L: Journal of Materials: Design and Applications, 229(4) : 352-364.
Gogebakan Z.,Selçuk Y.,Selçuk N.,E. N. . .. , : .
. .Investigation of ash behavior in fluidized bed combustion of biomass fuels. Bioresource Technology, 100(3) : 1033-1036.
Shehada M.,Tran M.-H. Patel Z.,Karydis K.,Brisk P.,Grover W. H. .2024 .Error detection using pneumatic logic. arXiv preprint arXiv:2401, 07 : 16500.
You B.,Song W.,D. W.,Goti E. .2024 .Failure and damage of reciprocating lip seals for pneumatic cylinders in dry conditions. Lubricants, 12(4) : 119-354.
. .. , : .
0

Citations

0

Downloads

14

Views