Project performance analyzed using java application in steel tower building

Author(s)
Zel Citra Department of Civil Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Yosie Malinda Department of Civil Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Risma Apdeni Department of Civil Engineering,Universitas Negeri Padang, Padang,Indonesia
Paksi Dwiyanto Wibowo Department of Civil Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Anom Wibisono Department of Civil Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Oties T. Tsarwan Department of Civil Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Suci Putri Elza Department of Civil Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Erlangga Riqzi Fitriansyah Department of Civil Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Mirnayani Department of Civil Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Yunita Dian Suwandari Department of Civil Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Abstract
The parameters of project success Studies conducted by project management science experts on project success reveal that cost, time, and quality are the three basic and most important indicators of performance in a project. Other parameters such as safety, functionality, and the client's satisfaction have begun to be considered lately. These parameters must be known by the project manager, client, and all stakeholders as a reference for implementing the project. Successful projects are measured in terms of timeliness, cost-efficiency, and optimal quality. In this study, a case was taken in PT. XYZ. However, in the implementation of development, there are often delays in the process, so the impact on the production process is detrimental to the industrial owner. Therefore, it is necessary to accelerate the development in this case of the construction of a feedmill tower with an alternative to the addition of overtime work in 3 ways, namely the addition of 1 hour overtime, 2 hours overtime, and 3 hours overtime. The data used in the analysis of the feed mill development project data with the normal time of the project for 360 days with a normal cost of US$ 5,149,297.20. From the results of the analysis of cost optimization due to the addition of overtime hours to accelerate the implementation, the optimum time to accelerate project completion is added 1 hour of overtime. Crash cost of required US$ 5.178.658,-. The time reduction to complete the project is 330 days. The additional cost is US$ 29.360, and the cost slope is US$ 26.913.
Publication Details
Page(s) 1463-1471
DOI DOI not available
Published Journal: ARPN Journal of Engineering and Applied Sciences, Volume: 19, Issue: 24, Year: 2024

Request the full text from PASTIC

Keywords
application, Java, steel, project, building
References
He Q.,Wang T.,Chan A. P. C.,Xu J. .2021 .Developing a List of Key Performance Indicators for Benchmarking the Success of Construction Megaprojects. Journal of Construction Engineering and Management, 147(2) : 04020164.
Lin G.,Shen G. Q.,Sun M.,Kelly J. M. .2011 .Identification of Key Performance Indicators for Measuring the Performance of Value Management Studies in Construction. Journal of Construction Engineering and Management, 137(9) : 698-706.
Madushika W. H. S.,Perera B. A. K. S.,Ekanayake B. J.,Shen G. Q. P. .2020 .Key Performance Indicators of Value Management in the Sri Lankan Construction Industry. International Journal of Construction Management, 20(2) : 157-168.
Jeferson A.,Branco B. V.,Pereira W.,Silveira W. .2018 .A Revaluation of the Criticality of the Project Manager to the Project's Success, Management Dynamics. , 8(2) : 01-18.
Mancini Miterev .2016 .Towards a design for the project-based organization. Int. J. Project Manage, 12(3) : 479-491.
Radujkovića S.,CCC S. .2017 .Project Management Success Factors. Creative Construction Conference, : .
Tavakoli Gandomani .2020 .The Role of Project Manager in Agile Software Teams. , : .
Apdeni R.,Rifwan Z.,Putri F.,Sandra P. Y.,Malinda N.,Wibowo P. D. Y.,Ashadi R. F.,Melinda A. P. .2024 .Application of ground penetrating radar for evaluating foundation structure condition after earthquake. Teknomekanik, 10(1) : 26772-100.
Rathnayake A.,Ranasinghe M. .2020 .A KPI Based Performance Measurement Framework for Sri Lankan Construction Projects. , : 348-353.
Emadi S. .2022 .Analyzing Cost and Time Objectives in the Construction Projects Using Artificial Neural Network. , : .
Hofstadler C.,Kummer M. .2019 .Influence of project preparation quality on the project outcome: A. , : .
Ahmed Y. A.,Shehzad H. M. F. Y. A.,Khurshid M. M. Abbas Hassan O. H Y. A.,Abdalla S. A.,Alrefai N. .2024 .Examining the Effect of Interoperability Factors on Building Information Modelling (BIM) Adoption in Malaysia. , : .
Pan H.,Pan Y.,Wu C. .2022 .Research on Integrated Management of L Hotel Construction Project Based on BIM5D. In Proceedings of the ICCREM, 15 : .
Sattineni A.,Macdonald J. A. .2014 .5D-BIM: A case study of an implementation strategy in the construction industry. In ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction; IAARC Publications: Sydney, : .
Citra Z.,Wibowo P. D. Z.,Malinda Y. .,Pranoto R Y. .,Pitaloka F. .2024 .Integration of Java Programming-Based Pert and Earned Value Management Methods Based on Residential Precast Case Study to Improve Project Cost Efficiency. Rekayasa Sipil, 10(1) : 12-17.
Oktaviyanus M.,Yanto P. E.,Bima M. .2023 .Pemrograman Menggunakan Java NetBeans. Biikma, 1(3) : 367-377.
Moussourakis J.,Haksever C. .2010 .Project compression with nonlinear cost functions. Journal of Construction Engineering and Management, 136(2) : 251-259.
Yang I-T. .2007 .Performing complex project crashing analysis with the aid of a swarm optimization algorithm. Int. J. Project Management, 25(6) : 637-646.
0

Citations

0

Downloads

41

Views