No Detail Found!

Defect reduction of automatic fare collection system for a new mrt monorail line using dmaic

Author(s)
Tossapol Kiatcharoenpol Department of Industrial Engineering, School of Engineering, King Mongkut's Institute of Technology Ladkrabang,,Thailand
Kewalin Pratalab Department of Industrial Engineering, School of Engineering, King Mongkut's Institute of Technology Ladkrabang,,Thailand
Sakon Klongboonjit Department of Industrial Engineering, School of Engineering, King Mongkut's Institute of Technology Ladkrabang,,Thailand
Abstract
The objective of this research is to examine and address issues related to the quality of the automatic fare collection system for the new Mass Rapid Transit (MRT) line and to decrease maintenance time to meet the key performance indicator (KPI) set by the Mass Rapid Transit Authority (MRTA). A total of 1,497 work orders were collected from a survey conducted between June and August 2023. The study utilizes the DMAIC methodology and identifies the primary issue as "Note Module Faulty" commands on the Ticket Vending Machine (TVM), particularly for cash transactions where banknotes become stuck in the banknote acceptor (BNA) section, resulting in transaction failures. After conducting a root cause analysis, it was determined that the problem stemmed from the inadequate design of the banknote acceptor for the new polymer banknotes, Biaxially Oriented Polypropylene (BOPP) film. Following the resolution of the problem, it was noted that the daily influx of work orders follows an exponential decay trend, represented by the equation Yt = 3.525x(0.97803t), and the maintenance time has decreased from 62 minutes per work order to 9.27 minutes per work order.
Publication Details
Page(s) 1173-1180
DOI DOI not available
Published Journal: ARPN Journal of Engineering and Applied Sciences, Volume: 19, Issue: 18, Year: 2024

Request the full text from PASTIC

Keywords
DMAIC, automatic fare collection system, banknote acceptor, quality problem solving
References
McNair D.,- D. .2016 .-period-feb16-3. International Best Legal Practice in Project and Construction Agreements, : .
Hassan J.,Aldowaisan T.,Nourelfath M. .2018 .Six Sigma for gamma-distributed processes: a case study in oil and gas. International Journal of Quality and Reliability Management, 35(8) : 1639-1652.
Singaravelan G.,Duraisamy S.,Pugazhenthi R. .2018 .An integrated DMAIC methodology for dynamic resource allocation in wheel axle manufacturing environment. International Journal of Mechanical Engineering and Technology, 9(8) : 367-376.
Nascimento F. R.,Santos A.,A. G. A.,Nunes Fonseca Júnior L. A.,D. M. Fonseca Júnior L. A. .2022 .Application of Lean Six Sigma to reduce delays in engineering changes. IEEE Transactions on Engineering Management, 3199388 : 2786-2799.
Prashar A. .2016 .Using Shainin DOE for Six Sigma: an Indian case study. Production Planning & Control., : .
Jirasukprasert P.,Garza-Reyes J. A.,Kumar V.,Lim M. K. .2014 .A Six Sigma and DMAIC application for the reduction of defects in a rubber gloves manufacturing process. International Journal of Lean Six Sigma, 10(1) : 2-21.
Li P.,Jiang P. .2019 .An enhanced DMAIC method for feature-driven continuous quality improvement for multi-stage machining processes in one-of-a-kind and small-batch production. IEEE Access, 2900461 : 32492-32503.
Mittal A.,Gupta P.,Kumar V.,Al Owad A.,Mahlawat S.,Singh S. .2023 .The performance improvement analysis using Six Sigma DMAIC methodology: A case study on Indian manufacturing company. Heliyon, 9(3) : .
Belvedere V.,Cuttaia F.,Rossi M.,Stringhetti L. .2019 .Mapping wastes in complex projects for lean product development. International Journal of Project Management, 01(3) : 410-424.
Purushothaman M. B.,Seadon J.,Moore D. .2020 .Waste reduction using lean tools in a multicultural environment. Journal of Cleaner Production, 121681 : .
Habib M. A.,Rizvan R.,Ahmed S. .2022 .Implementing lean manufacturing for improvement of operational performance in a labeling and packaging plant: A case study in Bangladesh. Results in Engineering. , 100818 : .
Kiatcharoenpol T.,Wisayathaksin C.,Chumongkon N.,Khuisangeum T.,Klongboonjit S. .2023 .Lean improvement for pantograph jack production process using Value Stream Mapping. ARPN Journal of Engineering and Applied Sciences, 18(10) : 1163-1170.
Leksic I.,Stefanic N.,Veza I. .2020 .The impact of using different lean manufacturing tools on waste reduction. Advances in Production Engineering Management, 10(1) : 81-92.
Sunder M. V.,Marathe G. L. S.,Marathe R. R. .2021 .A dynamic capabilities view of lean in a service context. IEEE Transactions on Engineering Management, 3089850(11) : 3887-3901.
0

Citations

0

Downloads

59

Views