No Detail Found!

Influence of girder age at continuity and construction sequence on the time dependent restraint moments in continuous prestressed concrete girder bridges

Author(s)
A. Hameed Department of Civil Engineering, University of Engineering and Technology, Lahore, Pakistan
M. Saleem Department of Civil Engineering, University of Engineering and Technology, Lahore, Pakistan
A. U. Qazi Department of Civil Engineering, University of Engineering and Technology, Lahore, Pakistan
J. Zhang College of Civil Engineering, Chongqing Jiaotong University, China
Abstract
One of the alternate to minimize the expansion joints in prestressed concrete bridges is to use continuous bridges in place of simply supported bridges by connecting the ends of the girders over the supports with a continuity connection. More continuity means shallow sections or longer spans which will consequently reduce the total cost of the bridge. Unlike the simply supported bridges, the design and construction of continuous bridges connected with the continuity connection require some additional consideration due to time-dependent restraint moments. Restraint moments are developed at the continuity connection due to creep and shrinkage effects which makes the design of continuous bridges different from conventional bridges. In this study, the construction stage time dependent analysis method is proposed using age adjusted effective modulus method (AEMM). In the proposed method of analysis, firstly, the change in curvature at number of sections due to creep, shrinkage and relaxation is calculated. Secondly, the long-term deflections and rotations are determined by numerical integration of curvatures for a number of sections along the length of the member. Once the long term deflections and rotations are determined, the restraint moments are calculated by the force method of structural analysis. A parametric investigation is then carried out to study girder age at continuity and different construction scenarios on the time dependent restraint moments. By delaying girder age at continuity connection and casting of the deck concrete over the span leads to lower positive restraint moments and more continuity.
Publication Details
Page(s) 26-31
DOI DOI not available
Published Journal: Pakistan Journal of Science, Volume: 65, Issue: 1, Year: 2013