No Detail Found!

Evaluation of different seepage control measures for a proposed “Golen Gol” weir in Pakistan.

Author(s)
BAZID KHAN Department of Civil Engineering, CECOS University of I.T. and Emerging Sciences, Peshawar, Pakistan
Muhammad Amin Project Director Contracts, Neelum-Jehlum Hydroelectric Project, Pakistan
NOOR BADSHAH Govt. College of Technology, Peshawar, Pakistan
Abstract
The Golen Gol weir foundation is pervious and there is a worry of considerable seepage. To control seepage, a scaled model of the weir section and its foundation was developed in SEEP/W and analysed for seepage quantity. The analysis was divided into several trials. In one trial, a continuous pervious foundation of weir without any seepage control measure was modelled and analysed for seepage quantity. This was used as a base (reference) case for comparison. In other trails, different seepage control measures, such as, downstream filter, upstream blanket, cut-off (upstream, mid, downstream) and combination of upstream blanket and cut-off, were used. Different lengths of upstream blanket and depths of cut-off were tried. In each trial, twenty different material regions were defined and hydraulic conductivity function (K-ratio = Ky/Kx) was defined for each region. Also, a total head of 2052m, on the upstream side, was selected as one of the boundary condition for the study problem. The results of the analysis revealed that the upstream blanket of length 30m and combination of downstream and upstream blankets (each 10m deep) showed nearly equal reduction in seepage quantity. However, the exit gradient for blanket was found more on safe side and also its cost of construction was estimated less than the cost of the cut-offs.
Publication Details
Page(s) 299-307
DOI DOI not available
Published Journal: Science, Technology and Development, Volume: 32, Issue: 4, Year: 2013

Request the full text from PASTIC

0

Citations

0

Downloads

76

Views