Substation grounding systems have been receiving more attention in recent years due to economic and technical considerations. In earlier years the human safety was themost important consideration, but now the economics is equally important as well. So the design should be developed on such frame work which is user friendly and may provide different alternatives, so that the design could be made optimal. In Pakistan the conventional methods of designing grounding system are still in practice, e.g. using manual calculations or work sheets. With the advent of modern technologies, there is a need to validate the new technology on actual grounding systems taking into consideration the actual system data or vice versa to check if the previously designed grounding systems satisfy the criteria of safety and economics. In this scenario we provide guidelines, elaborating the importance of a user-friendly technique, for the improvement in the design of a substation grounding system and for analyzing the effects of various parameters on the design using ETAP. The design has been validated by actual system parameters of 220 kV Ludewala Substation and 132 kV Jail Road Multan Substation. Cost analysis has been performed to select the optimal configuration.