No Detail Found!

Modified Snyder's time base and U.S. Army corps of Engineers' equations for estimating synthetic unit hydrographs in ungauged catchments of N.W.F.P. Pakistan.

Author(s)
M. Ibrahim Agricultural Engineering Department, NWFP University of Engineering & Technology (UET), Peshawar, Pakistan
Syed Mussarat Shah Civil Engineering Department, NWFP University of Engineering & Technology, Peshawar, Pakistan
Hazrat Hussain Government College Technology, Peshawar, Pakistan
Abstract
This paper describes an empirical method of deriving snyder's time base and U.S. Army corps of Engineers equations of synthetic unit hydrography for small catchments of NW.F.P. using basin area (A), Peak discharge (qPR), time base (T), and width of observed unit hydrography at 25% (W25), 50 % (W50), and 75 % (W75) of peak discharge. The data were extracted from unit hydrographs derived for nine catchments out of which six are located in Northern while three are situated in Southern region of N.W.F.P. The approach used is to take observed unit hydrographs from selected gauged basins and a relationship established between basin area and unit hydrographs characteristics, such as time base, peak discharge, W25, W50, and W75 of peak discharges. Snyder's original parameters for time base and U.S Army corps of Engineers Equations for time width of synthetic unit hydrogrpahy at 50% and 75% of peak discharges were not found in line with the hydrological conditions of the catchments under study. These empirical equations have therefore been modified for local conditions.
Publication Details
Page(s) 37-44
DOI DOI not available
Published Journal: Journal of Engineering and Applied Sciences, Volume: 17, Issue: 1, Year: 1998

Request the full text from PASTIC

0

Citations

0

Downloads

96

Views