No Detail Found!

Initial environmental examination for power plant in local sugar mill.

Author(s)
Saima Jan Muhammad Department of Chemical Engineering, UET Lahore, Pakistan
Syed Hassan Javed Department of Chemical Engineering, UET Lahore, Pakistan
Naveed Ramzan Department of Chemical Engineering, UET Lahore, Pakistan
Masooma Rustam Department of Chemical Engineering, UET Lahore, Pakistan
Abstract
This research presents the IEE (Initial Environmental Examination) and EIA (Environmental Impact Assessment) for sugar mills as power generation business. The study evaluates the proposed project according to the environmental assessment requirements of the Pakistan Environmental Protection Agency. The study has been conducted using standard environmental assessment methodology with the consultation of national and international environmental guidelines such as World Bank environmental and International Finance Corporation (IFC). The environmental impacts for the installation of a cogeneration thermal power plant adjacent to existing sugar mill located in district Muzaffargarh has been considered as a case study. It has been concluded that the residual impacts of the proposed operation will be of minor significance and careful implementation of the Environmental Management Plan (EMP) will ensure that environmental impacts are managed.
Publication Details
Page(s) 23-40
DOI DOI not available
Published Journal: Journal of Faculty of Engineering and Technology, Volume: 21, Issue: 3, Year: 2014

Request the full text from PASTIC

0

Citations

0

Downloads

65

Views