Remedial measure for delays at construction stage.

Author(s)
Zubair Ahmed Memon Department of Civil Engineering, Mehran University of Engineering & Technology, Jamshoro, Pakistan
Abstract
The delays are the most common events that influence the time performance, increase the cost of construction and are a major cause of loss to the public. There is perceived need for detailed information on how to identify, examine and choose alternative course of action to minimize the adverse effects of delays on time, cost and quality. Researchers have proposed the appropriate remedial measures for the Non-Excusable delays, but there is no major study on the factors of Excusable delays. Here, the gap is identified to carry out the research and identify the corrective actions for the factors of excusable delays. A questionnaire survey has been carried out to achieve the aim and objectives of this study and suggest the appropriate corrective actions for the factors of delays. It is intended that the research findings would generate some proposals on how to minimize or reduce the delays and cost overrun problems and improve the efficiency and productivity of the construction industry.
Publication Details
Page(s) 9-20
DOI DOI not available
Published Journal: Mehran University Research Journal of Engineering and Technology, Volume: 23, Issue: 1, Year: 2004

Request the full text from PASTIC

0

Citations

0

Downloads

35

Views