Optimum preventive maintenance replacement time for the AFAM thermal power station.

Author(s)
Mark C. Eti Mechanical Engineering Department, Rivers State University of Science and Technology, Nigeria
Harold U. Nwosu Mechanical Engineering Department, University of Port Harcourt, Nigeria
Abstract
Maintenance experts agree that replacing component/equipment before it fails may, under certain circumstance, make better economic sense than replacing the component/equipment when it fails. The key is to determine whether the preventive maintenance replacement of specific component/equipment is appropriate and if so, to identify the best time to replace it. Generally maintenance is the area where sound management principles are still largely ignored in Afam Power Station, hence maintenance productivity is very low and the associated costs of repair/replacement as a percentage of total cost continue to increase. Therefore, power plants/auxiliaries in the station are facing big repair/replacement cost challenges. In order to improve the PM activities, an optimum replacement time of plants/equipments was conducted. A net present value was used in order to determine the optimum time of pump replacement as a case study. Based on this study, several actions and strategies are suggested to reduce complex problems and implications, one of which is to use proactive maintenance strategy for long-term strategy.
Publication Details
Page(s) 57-65
DOI DOI not available
Published Journal: Journal of Engineering and Applied Sciences, Volume: 25, Issue: 1, Year: 2006

Request the full text from PASTIC

0

Citations

0

Downloads

68

Views