No Detail Found!

Digitalizing construction monitoring by integrating CAD drawings and digital images.

Author(s)
Zubair Ahmed Memon Department of Civil Engineering, Mehran University of Engineering & Technology, Jamshoro, Pakistan
Tauha Hussain Ali Department of Civil Engineering, Mehran University of Engineering & Technology, Jamshoro, Pakistan
Mohammad Zaimi Abdul-Majid Construction Technology and Management Center, Faculty of Civil Engineering, University Technology Malaysia, 81310-UTM, Skudai, Johor, Malaysia
Abstract
It is widely recognized that construction is information intensive and complex industry. In today’s construction industry, information and automation technology must be viewed as potential resources. CIC (Computer Integrated Construction) is an emerging technology and this study attempts to investigate the issue of implementing CIC at construction stage to monitor the project progress. A persistent problem in construction is to develop the as built actual physical progress schedule of construction scene. Manual monitoring of construction sites is costly and error prone. The main focus of this paper is to identify the techniques, which were used in the construction industry for monitoring and evaluating the actual physical progress, and discuss the development of the prototype model. Consequently, this study addresses DCM (Digitalizing Construction Monitoring) automated model for monitoring and evaluating the physical progress of the project. The DCM Model is an interactive system which integrates 3-D CAD drawings, planned schedule of activities and digital images. The DCM model was tested on a pilot study of Larkin Mosque Car Parking Project. By introducing the DCM at the construction phase it allows the resident engineer, project manager, construction manager, and site manager to develop the physical progress report of construction activities and helps in decision making. The applications of DCM model in monitoring the progress enables project management team to better track and control the productivity and quality of construction projects. This system bridge the gap for monitoring and controlling the construction work by implementing the information technology techniques.
Publication Details
Page(s) 271-284
DOI DOI not available
Published Journal: Mehran University Research Journal of Engineering and Technology, Volume: 25, Issue: 4, Year: 2006

Request the full text from PASTIC

0

Citations

0

Downloads

37

Views