No Detail Found!

Tender simulation using the friedman method in factory buildings project

Author(s)
Yosie Malinda Department of Civil Engineering, Faculty of Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Zel Citra Department of Civil Engineering, Faculty of Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Reza Ferial Ashadi Department of Civil Engineering, Faculty of Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Risma Apdeni Department of Civil Engineering, Faculty of Engineering,Universitas Negeri Padang, Padang,Indonesia
Lily Kholida Department of Civil Engineering, Faculty of Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Hamonangan Girsang Department of Civil Engineering, Faculty of Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Paksi Dwiyanto Wibowo Department of Civil Engineering, Faculty of Engineering,Universitas Mercu Buana, Jakarta,Indonesia
Abstract
Winning a project tender with a large profit and a low bid value is an obstacle for the contractor. An accuracy level of 5% to 10% in cost estimates is required when preparing bids; to overcome this, markup analysis is needed to increase the probability of winning and profit according to expectations. The methods used to find the appropriate probability of winning and expected profit are the Friedman method. The results of this research in the case study of the project PT. XYZ, three contractors took part in the tender and were given the symbol PT. C1, PT. C2, and PT. C3. The results of the data analysis of the probability of winning the tender for the construction project work between PT. C1, PT. C2, and PT. C3 shows that PT. C1 has a 97.90% probability of winning using the Friedman method. The highest profit amount using the Friedman method, and in line with expectations, when participating in the tender for construction project work between PT. C1, PT. C2, and PT. C3 is PT C1with profit 13.22%.
Publication Details
Page(s) 879-890
DOI DOI not available
Published Journal: ARPN Journal of Engineering and Applied Sciences, Volume: 20, Issue: 12, Year: 2025

Request the full text from PASTIC

Keywords
factory building, tenders simulation, Construction project, Friedman Method
References
Negara Republik Indonesia Lembaga .2015 .. Peraturan Presiden Nomor 4 Tahun, : .
Gokmauli F.,Kelayakan Pelaksanaan Sistem Lelang Elektronik (E-Procurement) pada Instansi Kajian,Pemerintah Kajian .2008 .. , 53(9) : 1689-1699.
Purnamaningrum Y. I. .2015 .Analisis Harga Penawaran Kontraktor pada Proses Pelelangan untuk Menda- patkan Nilai Expected Profit dengan Pemodelan Friedman. , 535 : 541.
Adafin J.,Rotimi J. O. B.,Wilkinson S. .2016 .Determining Significant Risks in the Variability between Design-Stage Elemental Cost Plan and Final Tender Sum. Journal of Management in Engineering, 5479(6) : 0000448.
Loannou Photios G. .2019 .Friedman's bidding Model: Errors and Corrections. ASCE Journal of Construction Engineering and Management, 7862(10) : 0001695.
Citra Zel .2025 .Project performance analyzed using java application in steel tower building. Mirnayani and Yunita Dian Suwandari, : .
Abotaleb I. S.,El-adaway I. H. .2016 .Construction Bidding Markup Estimation Using a Multistage Decision Theory Approach. Journal of Construction Engineering and Management, 7862(1) : 0001204.
Loannou Photios G. .2021 .Risk-Sensitive Competitive Bidding Model and Impact of Risk Aversion and Cost Uncertainty on Optimum Bid. ASCE Journal of Construction Engineering and Management, 7862(3) : 0002244.
Yuliana C.,Kartadipura R. H.,Taufik S. .2016 .Bidding Strategy Using Friedman Model for Building Construction Project in Banjarbaru Indonesia. , 20160101(1) : 12-17.
Bari P.,Bari P. .2016 .An empirical analysis of winning bids in public procurement in the Italian construction sector. , : .
Awwad R. .2016 .Evolutionary Simulation of Contractors Learning and Behavior under Two BidTendering Approaches. , 5479(2) : 0000400-13.
Matthew Rosenshine .2021 .Bidding Models: Resolution of a Controversy. ASCE Journal of the Construction Division, 98(1) : .
Xinli Zhang,Yu Yu.,He Yu. .0002062 .Bidding Decision-Support Model for Construction Projects Based on Projection Pursuit Learning Method. Journal of Construction Engineering and Management, 147(7) : 1943-7862.
Ahmed M. O.,El-adaway I. H. .2023 .Data-Driven Analysis of Construction Bidding Stage-Related Causes of Disputes. Journal of Management in Engineering, 39(5) : .
Wang Xiaowei.,Ye Yao,Zhangfeng Yao .2021 .A Conceptual Framework for the Inclusion of Exogenous Factors into Collusive Bidding Price Decisions. Journal of Management in Engineering, 5479(6) : 0000981.
Wang Xiaowei.,Ye Arditi,David Arditi .0002044 .Embodied Cost of Collusive Bidding: Evidence from China's Construction Industry. Journal of Construction Engineering and Management, 147(6) : 1943-7862.
Semaan N.,Salem M. .2017 .A deterministic contractor selection decision support system for competitive bidding. Engineering, Construction and Architectural Management, 24(1) : 61-77.
Zhang B.,Le Y.,Xia B.,Skitmore M. .2017 .Mixed Perceptions of Business-to-Government Guanxi in Tendering and Bidding for Infrastructure Projects in China. Journal of Professional Issues in Engineering Education and Practice, 5541(4) : 0000325.
Apdeni R.,Rifwan Z.,Putri F.,Sandra P. Y.,Malinda N.,Wibowo P. D. Y.,Ashadi R. F.,Melinda A. P. .2024 .Application of ground penetrating radar for evaluating foundation structure condition after earthquake. Teknomekanik, 7(1) : 26772-100.
Zhang Y.,Luo H.,He Y. .2015 .A System for Tender Price Evaluation of Construction Project Based on Big Data. Procedia Engineering, 10 : 606-614.
Widjaja I. P.,Brunner T.,Dhipawardana M. D. .2011 .Pengaruh perhitungan volume pekerjaan terhadap margin profit sebagai acuan penentuan harga satuan pekerjaan, studi kasus pada pekerjaan rs. boromeus bandung, 2(1) : 49-58.
Woo S.,Lee S.,Cho C. S.,Kim S.,Bin S. .2016 .Study on the issues of the lowest bidding through the analysis of working budget ratio of Korean construction companies. KSCE Journal of Civil Engineering, 21(5) : 1587-1594.
Wood L. C.,Wang C.,Abdul-Rahman H Jamal,Abdul-Nasir N. S. .2015 .Green hospital design: Integrating quality function deployment and end-user demands. Journal of Cleaner Production, 08 : 903-913.
Citra Zel.,Wibowo P. D. Malinda,Yosie Apdeni,Risma Apdeni .2022 .Integrasi Metode Friedman dan Definitive Technique Berbasis Aplikasi guna Meningkatkan Probabilitas Menang dan Profit Harapan Tender Proyek Bangunan Precast. CIVED Journal, 9(3) : 117962-386.
0

Citations

0

Downloads

15

Views