Islamabad, the capital city of Pakistan, is a relatively new city and has grown exponentially over the last four decades. It has a design potential of producing 111.6 million gallons per day (MGD) of potable water from ground, as well as various surface sources, of which the Simly Dam is the largest, having 42 MGD capacity. This Dam is about 28 km away from the city and the water is conveyed through two 36 inch dia Pre-stressed Reinforced Cement Concrete (PRCC) Pipes and one 48 inch dia Ductile Iron (DI) pipe, all through gravity. The PRCC pipes have almost lived their useful lives, particularly in the high-pressure regions. In addition, mushroom growth of population all along the pipes’ inspection road has also caused unwarranted stresses on these lines, in addition to poaching of water. In this paper, the case has been studied and possible remedies for the problems have been discussed.