Breakeven analysis of thermal energy storage system under uncertain operating conditions

Author(s)
Ali Akbar Department of Industrial Engineering and Management, Dawood University of Engineering and Technology,,Pakistan
Kaka Shuaib Department of Industrial Engineering and Management, Dawood University of Engineering and Technology,,Pakistan
Ghulam Mujtaba Department of Industrial Engineering and Management, Dawood University of Engineering and Technology,,Pakistan
Darya Khan Department of Industrial Engineering and Management, Dawood University of Engineering and Technology,,Pakistan
Shahnawaz Ali Department of Industrial Engineering and Management, Dawood University of Engineering and Technology,,Pakistan
Jansher Ansari Department of Industrial Engineering and Management, Dawood University of Engineering and Technology,,Pakistan
Imran Khan Department of Industrial Engineering and Management, Dawood University of Engineering and Technology,,Pakistan
Abstract
Since thermal energy storage (TES) systems gained momentum in the global energy market, there is a greater demand to enhance their energy efficiency and, more significantly, lower their costs. The purpose of the study is to assist decision-making under uncertainty and risk associated with stochastic increases in cost connected with Thermal Energy Storage System operation. The Thermal Energy Storage System (TSS) at the Gas District Cooling Plant in Perak, Malaysia is the purpose of this research. When fluctuating cooling demands develop, the Thermal Energy Storage System (TSS) is used to transfer energy use from peak to off-peak hours. For TSS and Gas District Cooling (GDC) systems, electric chillers and thermal storage tanks are required. Thermal energy systems (TES) play a role in the ongoing process of increasing integration across diverse energy systems to achieve a cleaner, more flexible, and long-term use of energy resources. Break-even analysis was used in the study, which is a basic tool for analyzing the feasibility of real-world initiatives with uncertainty. The findings reveal that a single-shift operation is not feasible, and the project will require at least two shifts to be viable.
Publication Details
Page(s) 160-163
DOI DOI not available
Published Journal: ARPN Journal of Engineering and Applied Sciences, Volume: 19, Issue: 3, Year: 2024

Request the full text from PASTIC

Keywords
thermal energy storage system, breakeven, gas district cooling
References
Jovanović P. .1999 .Application of sensitivity analysis in investment project evaluation under uncertainty and risk. International journal of project management, 17(4) : 217-222.
Kaka S. .2022 .Fuzzy logic-based quantitative risk assessment model for use in the oil and gas industry. Universiti Teknologi PETRONAS., : .
Akbar A.,Mokhtar A. A. B. .2017 .Integrating Life Cycle Costing (LCC) and Life Cycle Assessment (LCA) Model for Selection of Centralized Chilled Water Generation. in MATEC Web of Conferences. EDP Sciences., : .
Zhu Y.,Tao Y.,Rayegan R. .2012 .A comparison of deterministic and probabilistic life cycle cost analyses of ground source heat pump (GSHP) applications in hot and humid climates. Energy and Buildings, 55 : 312-321.
Khan K.,Rasul M.,Khan M.,Nasir M.,Chong H.,Osman S. .2015 .Probabilistic life cycle cost model for a repairable system. In IOP Conference Series: Materials Science and Engineering, : .