Cable structures are often used as final or incomplete structures in the phases of bridge construction such as arch or rope bridges. These bridges are often built with cantilevering, i.e. with subsequent cantilever frames, which are also stayed with the cable; therefore, all construction stages are a cable structure that will be analyzed. The method of structural analysis of these construction phases and modeling of the strength of the first cable strength is an important step in establishing the real state of tension and deficit. In the paper, a standard method of structural analysis of cable structures, which can be used to build cable-stayed bridges and arch bridges, has been introduced. The proposed approach is based on a simple analysis of many expandable schemes, which follow the actual construction sequence. The aim is to achieve a simple final geometry for disability management from the first to the last stage, which is consistent with residential life planning. Geometry and internal strength are currently being tested, as well as strong cable strength outside the desideratum with the worst number of stressful changes. The results of the analysis, conducted in various case studies, are reported, summarized, and noted, to demonstrate the reliability and scope of application of the proposed analysis method.