Abstract
The pipe-line construction industry broadly uses welding processes in pipeline development to connect pipes before laying it down under the surface. SMAW welding process which is also known as 'Stick Welding' is the most dominant and common welding process. SMAW process poses a lot of limitations in terms of weld integrity, quality, productivity of overall job, and profitability owing to its manual nature. It thus affects the overall efficiency of pipe-line construction jobs. Such an operation is obvious candidate for automation. A Semi-Automatic system is recently procured at SSGCL (Sui Southern Gas Company Ltd) which employs combination of FCAW and GMAW welding processes. This study aims at deriving a performance analysis between the Combined FCAW-GMAW process and the existing SMAW process. This semi-automatic combined FCAW-GMAW process may prove to be the answer to limitations posed by SMAW Welding process in aspects of overall productivity, weld quality, and cost of pipeline construction jobs at SSGCL (Sui Southern Gas Company Ltd).
Publication Details
Page(s) 278-282
DOI DOI not available
Published Journal: Pakistan Journal of Science, Volume: 71, Issue: 4S, Year: 2019

Request the full text from PASTIC

Keywords
GMAW, FCAW, SMAW, welding processes, Mechanized Welding, Pipeline Construction