SCHEDULE AND COST BEHAVIOUR IN CONSTRUCTION WORKS OF MALAYSIA

Author(s)
I.A. Rahman Universiti Tun Hussein Onn Malaysia (UTHM), Malaysia
L.C. Foo Universiti Tun Hussein Onn Malaysia (UTHM), Malaysia
A.H. Memon Civil Engineering Department, Quaid-e-Awam University of Engineering Science and Technology,Nawabshah,Pakistan
S. Nagapan Universiti Tun Hussein Onn Malaysia (UTHM),Malaysia
Abstract
Stakeholders have great concern of schedule and cost behaviour in construction works. Due to any loss in schedule and cost performance, one has to bear unrecoverable monetary loss. Currently, construction works are suffering from poor schedule and cost behaviour in almost all the countries of the world including Malaysia. Hence, this paper investigated the schedule and cost behaviour of infrastructure and building projects of Malaysia. This paper addressed the issue by conducting case study of 6 projects including 3 infrastructure works and 3 building works. The findings of the study revealed that 5 projects had overrun. All the three infrastructure works face time overrun problem while only one building project was completed as per schedule and estimated budge where other two projects consumed extra time and budget. These findings are helpful for stakeholder to understand the behaviour of the construction works from time and cost perspective.
Publication Details
Page(s) 74-77
DOI DOI not available
Published Journal: Pakistan Journal of Science, Volume: 71, Issue: 4S, Year: 2019

Request the full text from PASTIC

Keywords
Malaysia, Schedule performance, cost performance, infrastructure projects and building projects