No Detail Found!

Estimating contingency sum for building works in Ghana.

Author(s)
RICHARD ODURO ASAMOAH Research Scientist, Building and Road Research Institute, Council for Scientific and Industrial Research, Kumasi, Ghana$
JAMES COFIE DANKU Department of Building Technology, Kwame Nkrumah University of Science and Technology, Ghana
P D BAIDEN AMISSAH Building and Road Research Institute, Council for Scientific and Industrial Research, Kumasi, Ghana
Abstract
It is a common practice in the construction industry in Ghana to allow for contingencies to cater for any unforeseen events. This study was to identify existing methods of determining contingency sum, factors influencing contingency sum and develop a new system of determining contingency sum. The study employed a case study of some 38 completed building projects in Ashanti and Brong Ahafo regions of Ghana to compare the accuracy of both the existing and the new method. Questionnaires were distributed to the selected professionals. Relative Importance Indices Ranking and the Kendall coefficient of concordance were used to rank factors and the agreement of factors ranking among building professions. It was established that the most commonly used method is the Percentage Approach method. The study revealed that 77% of the building professionals have been using the Percentage Approach and 23% have been using the Probabilistic Estimation Methods. These methods were based on subjective approach. Economic, Environmental and Technical factors were identified as the most influential factors. The study concludes by developing a new software system of determining contingency sum and new method was found to be 45% more accurate than the Percentage Approach.
Publication Details
Page(s) 266-275
DOI DOI not available
Published Journal: Science, Technology and Development, Volume: 32, Issue: 3, Year: 2013

Request the full text from PASTIC

0

Citations

0

Downloads

36

Views