Application of boiler-preheater fuzzy coordinated control for clinker plant.

Author(s)
Xiang Zhang State Key Laboratory of Coal Combustion, Huazhong University of Science and Technology, Wuhan 430074, Hubei, China; Guangdong Institute of Metrology, South China National Centre of Metrology, Guangzhou 510405, Guangdong, China; School of Electric Power, South China University of Technology, Guangzhou 510641, Guangdong, China
Jidong Lu State Key Laboratory of Coal Combustion, Huazhong University of Science and Technology, Wuhan 430074, Hubei, China; Guangdong Institute of Metrology, South China National Centre of Metrology, Guangzhou 510405, Guangdong, China; School of Electric Power, South China University of Technology, Guangzhou 510641, Guangdong, China
Abstract
A boiler-preheater fuzzy coordinated control system used in new type dry rotary kiln and pure low temperature waste heat recovery power generation has been presented in this paper. Heat of waste gas from cement kiln is recovered by the power generation. Significantly, SP boiler of the power generation recovers heat of the gas from kiln preheater. The temperature of the recovered gas from cement kiln is continuous fluctuant because of severe condition of cement kiln. The fluctuant temperature is unfavorable for power generation. For high efficiency of systems in of cement kiln and waste heat power generation, development and tests of the boiler-preheater fuzzy coordinated control system have been carried out in a cement kiln plant adding low-temperature waste heat power generation in Guangdong, China. The actual application result shown that the boiler-preheater fuzzy coordinated controller is available and efficient.
Publication Details
Page(s) 212-221
DOI DOI not available
Published Journal: Journal of Theoretical and Applied Information Technology, Volume: 45, Issue: 1, Year: 2012