A number of problems were encountered during the first impounding of Khanpur Dam which took place accidentally due to extra ordinary precipitation just after the closure of diversion tunnel during 1983. The major problems were extremely high seepage, boiling and springing of water at a number of places downstream dam, uplift pressures at the toe of main dam near left abutment, turbid flow from relief wells and development of sinkholes in the reservoir area. Immediately various remedial measures were adopted for the treatment of the problems. In the phase-1, installation of double line relief wells at the toe of main dam and left saddle were provided. Drain holes in diversion tunnel and downstream of right saddle and strengthening of grout curtain of left abutment of main dam were also carried out. Sinkholes were treated and barge dumping was made over seepage ingress areas. After the remedial works of 1st phase, the filling of reservoir was restricted to the level of 1965 feet instead of 1982 feet of design elevation. Due to increased demand of water from Capital Development Authority Islamabad, phase-2 remedial works were initiated during 1999. These works were started to cut down the extra ordinary seepage to the tune of 16% of the base flow through fractured carbonate geology and to ensure the safety of the dam structures. The major' dam safety works carried out during 1999-2002, comprising of strengthening and deepening of grout curtain on right & left abutment of main dam and dental treatment of open joints in the reservoir area. After the completion of approximately 50% of designed dam safety works, the dam is being operated at, full storage capacity with maximum reservoir level of 1982 feet and regulating 2,50,000 acre feet of water annually. However still approximately 50 cusecs of seepage water at reservoir level of 1982 feet is being destroyed which is great economic loss. It is also increasing the fractures by dissolving the limestone formation; suggestions are made to overcome the problem.