No Detail Found!

Evaluation of Lahore Bus Rapid Transit Based on Key Performance Indicators.

Author(s)
R Aziz Department of Transportation Engineering and Management, University of Engineering and Technology, Lahore, Pakistan
Z Rehman Department of Transportation Engineering and Management, University of Engineering and Technology, Lahore, Pakistan
F Haider Department of Transportation Engineering and Management, University of Engineering and Technology, Lahore, Pakistan
B Malik Department of Transportation Engineering and Management, University of Engineering and Technology, Lahore, Pakistan
Abstract
The study analysed the bus rapid transit (BRT) system in Lahore based on operational key performance indicators (KPI)compiled into an evaluation framework with reference to international guidelines and standard practices of countries with successful experiences of BRT. The study relied on data obtained from automated data collection system of Punjab Metrobus Authority (PMA). This enabled the research to include complete population and lead to concrete results instead of conducting only sample studies. The raw data was converted into useful information through computer programmes specifically developed for this research. The performance of bus services was measured and compared according to different operational parameters such as Travel Time Savings, Service Reliability, Capacity and Comfort, Safety and Security. Detailed investigations and results were included in the manuscript. The study concluded that the overall situation of bus operations was quite satisfactory, however there are minor weaknesses observed in certain areas such as Schedule Adherence, Headway Regularity and Capacity.
Publication Details
Page(s) 20-25
DOI DOI not available
Published Journal: Pakistan Journal of Science, Volume: 67, Issue: 1, Year: 2015

Request the full text from PASTIC

References
2011.Toolkit for Public Private Partnerships for Urban Transport for the State of Maharashtra, India, 17 -
2004.FTA and DOT. Characteristics of Bus Rapid Transit for Decision Making,Pp 123 200 -
Florida, 2002.Evaluation Guidelines for Bus Rapid Transit Demonstration Projects, 28 -
Hidalgo , D., 2010.Status of the BRT Industry. Research Paper Presented in BRT-ALC Center of Excellence Meeting on January 25 (, -
ITDP. Bus Rapid Transit Planning Guide, .,Pp 687-718 -
2010.JICA and TD. Survey Data for Lahore Urban Mass Transit Plan, -
Laura , C., 2006.Thesis for fulfillment of Masters in Transportation, -
2013.Contract for procurement, operations and maintenance of Lahore Metrobuses, -
WikipediaThe Free Encyclopaedia. Bus Rapid, 2013.Transit, -
2013., -
0

Citations

0

Downloads

47

Views