Probabilistic analysis of completion time of a housing project.
Author(s)
R. A. Ashrafi
Mathematics Department, King Saud University, Riyadh, Saudi Arabia
M. Z. Khan
Institute of Mathematics & Computer Science, University of Sindh, Jamshoro, Pakistan
A. Mirza
Abstract
In this paper quantification aspects of risk involved with the completion time of a project are studied. A number of stochastic distributions are fitted for this purpose to the ratio of planned and actual durations for the different activities of a housing project. A brief description of the distributions and detailed derivation of the mathematical equations for maximum likelihood estimation of the parameters of the distributions is provided. The method of maximum likelihood is used for estimation of the parameters of the distributions. Kolmogorov-Smirnov test's utilized for testing the goodness of fit of the distributions. Weibull distribution provided better fit for most of the activities of the project data studied.
Publication Details
Page(s)
55-66
DOI
DOI not available
Published
Journal: Journal of Pure and Applied Sciences, Volume: 9, Issue: 2, Year: 1990
Request the full text from PASTIC
More from
Journal of Pure and Applied Sciences
Common fixed point results by iterations using linear mappings.
Comparative study of double and triple directional correlations of gamma-rays.
Synthesis and reactions of 4, 6-diaryl-1, 2-dihydro-2.0x0-3- nicotinonitriles.
Behaviour of 24-phenylimido-B-g-nitrophenyl) vinyl-(4H)3, 1-benzoxazin-4-one towards some nucleophiles.
Interaction of cis dimethyl sulphoxide with egg phosphatidyl choline liposome using Proton Nuclear Magnetic Resonance spectroscopy (PNMR).
0
Citations
0
Downloads
38
Views