No Detail Found!

History and developments in the design of alluvial channels.

Author(s)
Tariq Masood Khan
Abstract
With the present pace of development of water resources in Pakistan and elsewhere in the world, it is not possible to always restrict the canal sediment loads to be small. The canals in many cases have to be operated round the year with large seasonal variations in water and sediment inputs. During winter the sediment loads in rivers are small from the reservoir supplied water and the canal head sediment entry may be practically nil, whereas, it may increase to excessive limits during monsoon period. Also, with the interbasin transfer of water and the prevalent regulation practices, the sediment regulation at the barrages has practically become impossible for major part of the year.
Publication Details
Page(s) 24-28
DOI DOI not available
Published Journal: Indus, Volume: 27, Issue: 2, Year: 1987

Request the full text from PASTIC

0

Citations

0

Downloads

54

Views