No Detail Found!

Development of an Integral Equation for a 2-machine production line-some numerical solutions in closed form. (1986b).

Author(s)
M. A. Javaid Mathematics Department, University of Engineering & Technology, Lahore, Pakistan
Christ K. Wright Mathematics Department, University of Bermingham, Bermingham, England, UK
Abstract
Based on an expression for the new inter-machine buffer stock level and assuming uniform distribution for the difference of the capacities of the machines, an Integral Equation for a 2-machine production line is developed which specifies the probability law for the buffer stock level in the steady state. A general procedure of obtaining numerical solutions of the Integral Equation in closed form is presented. To demonstrate the procedure of solution, some numerical examples are worked out and the graphs for cumulative distribution and the frequency density of the buffer stock level falling in the specified intervals are plotted.
Publication Details
Page(s) 98-117
DOI DOI not available
Published Journal: Research journal, Volume: 2, Issue: 1, Year: 1988

Request the full text from PASTIC

0

Citations

0

Downloads

106

Views