In early eighties the Water and Power Development Authority, WAPDA, of Pakistan Studied hydropower da m sites were potential selected. of Out the of Upper these Indus at 5 sites, Basin. with 32 estimated installed capacity of 11,000 MW, electricity can be generated more economically than through a residual oil-fired thermal installation; and at one site at same unit cost. Moreover, 7 sites have capability of generating more than 7,000 GWH/annum (equivalent to about two year's load growth), and another 6 between 1,000 and 7,000 GWH/annum.