In Pakistan out of the total installed generating capacity of about 1800 MW, there is 1000 MW of thermal capacity and 800 `5/ of Hydel capacity in the Northern Grid. Effect of monsoon failure and dry winters are factors, that disbalance the generation mix. Thermal generation and the hydel generation fulfil the demand for power in our country. They are working from the opposite ends of the load duration curve; as they converge, it becomes clear that midrange area needs specialized generation in itself, but there are difficulties of maintaining a high capacity factor during light load period with the large units. The fear of heavy penalties and the increasing longer period of construction for base load additions. To solve these problems simple cycles gas turbines are installed which may be converted to combined cycle operation, by adding the heat recovery system installed by steam generator steam turbines and condensers. The designing of the coal gasification plants is going on, it may be possible to gasify low quality coal into an environmentally acceptable fuel. The two phase approach to develop power projects connected with gas turbine installations should receive considerations of the thermal engineers.