Distribution Master Plan 1965-70 was a proper effort in putting the planning of Electric Supply System of Wapda on the right footing in terms of distribution planning-determination of distribution load centres with their requirements transmission planning to satisfy the requirements of these load centres by connecting them through adequate transmission from the generating stations, whose capacity is determined by the load requirement. After careful detailed planning of the whole system, time scheduling of the different works of financing, procurement, construction, testing and energization could be regulated and the whole system geared to work in unison and cohesion. With modern techniques of Critical Path Method of PERT(Programme Evaluation Review Technique) the cost versus time characteristics could be studied and the investment brought to a minimum in the time scale to give the maximum utility to the public.