The problems of the average farmer are reviewed in the project areas of the West Pakistan Agricultural Dev. Corp. in relation to waterlogging and salinity, ground water resources, and specification of drainage works, etc. It is contended that only the actual data on the availability of water resources can help in the maximum use of ground water for irrigation purposes, therefore the Gaja command area, where several tubewells installed by the West Pakistan Agricultural Dev. Corp. have failed, is selected as an example. It is, therefore suggested that data be worked out to establish (i) the draw-down discharge relationship, (ii) efficiency and life of the screens of different types and materials, (iii) efficiency of motors and pumps (iv) corrosion and incrustation of screen, and (v) water-table levels at the well between any wells. It is also suggested that as all these factors are interrelated, chemists, agronomists, and engineers should join hands. Project estimates for surface drainage on the Ghulam Mohammad Barrage have been worked out in light of the above.