Pakistan Science Abstracts
Choose Theme
1
2
3
4
Theme 1
— Green & Gold
Print
Save as PDF
Export BibTeX
Close
No Detail Found!
Home
›
Indus
Chenab weds Ravi the fourth time. (Qadirabad Balloki link canal provides the fourth link between these two river.
Author(s)
S. M. Rizwan Abidi
Tipton & Kalmbach Inc. USA
Abstract
Constructional details of Qadirabad-Balloki link canal in the Rechna Doab area are presented.
Publication Details
Page(s)
7-13
DOI
DOI not available
Published
Journal: Indus, Volume: 11, Issue: 1, Year: 1968
Request the full text from PASTIC
More from
Indus
Power Station costs.
A study of our rural power distribution systems.
How Sudan does it (irrigation).
The tale of two Mirpurs.
Electrical power system integration of thermal hydro and nuclear power stations.
0
Citations
0
Downloads
55
Views