No Detail Found!

Operating Bombanwala Ravi Bedian Depal-pur Link Canal in 1961.

Author(s)
Mohammad Ali Chaudhry B. S. Link Remodelling Division, Lahore, West-Pakistan
Abstract
The methods adopted by the author to stabilize Bomlanwala Ravi Bedian Link canals to run its authorized supply of about 5000 cusecs is described. (From Engng News, 1965, 10(1): 20).
Publication Details
Page(s)
DOI DOI not available
Published Journal: Proceeding of West Pakistan Engineeringg Congress, Volume: 48, Issue: , Year: 1965

Request the full text from PASTIC

0

Citations

0

Downloads

89

Views