The results of resistivity surveys carried out at two proposed damsites on the Nari-Beji river system, north of Sibi are presented and discussed. Estimates of the probable thicknesses of the overburden materials in the main river channel have been made at the two sites and certain conclusions about the underlying bedrock have been drawn.