For equitable and reliable water distribution, institutional reforms were introduced by the Government of Punjab at Lower Chenab Canal (East) Circle, Faisalabad during 2000 as pilot project. Under reforms these participatory irrigation management (PIM) activities were started. Impact of these Institutional reforms was assessed in the Faculty of Social Sciences, UAF, Pakistan during the year 2010-11 to see farmer,s perception and satisfaction about PIM activities. For this purpose 480 respondents were selected through multistage sampling technique for data collection. According to farmers’ perceptions, more than 66 percent of farmers reported repair of “nakka”, while recalibration of outlet was reported by 56.5 percent farmers in ranking analysis, satisfaction about water turn (warabandi) topped with mean score of 2.72 followed by Khal Panchayat reporting of water theft cases to farmer,s organization with mean score of 2.34. The regular participation of farmers in maintenance was more than 92 percent. After implementation of PIM activities, the cropped area increased by 4.98 percent in rabi season and 5.42 percent in kharif season. The results indicate that equitable water distribution as a result of PIM activities increased. The satisfaction level of farmers was good but not upto the mark which suggests more strict action and enforcement of Punjab Irrigation and Drainage Authority (PIDA) laws to have equitable and reliable water distribution for betterment of farming community.