No Detail Found!

Performance of a gasketed bolted flanged pipe joint tinder bolt up, internal pressure and dynamic (harmonic and transient) axial loads

Author(s)
Muhammad Abid Faculty of Mechanical Engineering, Ghulam Ishaq Khan Institute of Engineering Sciences and Technology, Topi
Atta ur Rehman Shah Department of Mechanical Engineering, HITEC University Taxila Cantt
Abstract
Studies regarding performance (strength and sealing) of the gasketed bolted pipe flanged joints under static loading are available in literature. However most operating conditions in the piping systems used in the industry are dynamic in nature such as harmonic (cyclic) loads with different harmonic frequencies and transient loads which are suddenly applied for a short period of time. In this study, performance of a gasketed flanged pipe joint using spiral wound gasket is analyzed under boltup, internal pressure and dynamic (harmonic and transient axial) loads. It is concluded that the harmonic axial loads are more challenging compared to the transient axial loading for the gasketed joints strength and sealing.
Publication Details
Page(s) 62-69
DOI DOI not available
Published Journal: NED University Journal of Research, Volume: 8, Issue: 2, Year: 2011

Request the full text from PASTIC

0

Citations

0

Downloads

25

Views