The population of Balochistan was 6.51 million during 1998, out of which 3.66 million urban and rural populations have domestic piped water facilities. The available water resources were 18,311 Million Cubic Meter (Mm3) during 1998; out of which the domestic water utilization was about 147 Mm3 and industrial/mining utilization was 33 Mm3. Up to the year 1970, throughout Balochistan, a circumscribed population was served by 18 Water Supply Schemes (WSS). The number of mechanized WSS was increased to 701 by 1992 and 1410 by 1997. Presently 3.1 million rural populations achieves their domestic water requirement through aforesaid WSSs. Quetta is the only urban center in Balochistan, where its 0.56 million populations are served with domestic supply through house connections. The remaining population is relying upon springs, open surface wells, handpumps, and rainwater collection ponds etc. The township WSS are designed for 60-80 liter per capita per day (lpcd) domestic water sonsumption by the year 2000 and 2015 respectively. The Quetta WSS is designed 130 lpcd and estimated that water consumption will increase continuously upto 180 lpcd by the year 2020; thereafter it will remain constant. The domestic water consumption of Balochistan was about 147 Mm3 during the year 1998; whereas for 2010 it will be 530 Mm3 and expected to increase upto 860 Mm3 for the year 2025. No remarkable industrial and mining activities were reported in Balochistan uptill 1960; while about 110 industrial units have been reported ruing 1992. All township and Quetta WSS have a provision of 5% and 7% of the total domestic consumption for industrial demand upto the year 2015, this is expected to increase by 13% by the year 2020. The industrial plus mining water demand was about 33 Mm3 during 1998, which is expected to be increased from 50-98 Mm3 upto 2010 and 2025 respectively. In Balochistan, the dry spell of 1998 that is still continuing, the estimated water balance scenario has been changed completely. The surface and groundwater resources dried and depleted to their extreme limits. Majority of the industrial units of Lasbella Industrial Estate has been closed due to water shortage and all water supply schemes severely effected. The communities not served with piped water, migrated to nearby schemes, relief camps established and water supply system revitalized. To combat the drought, immediate, short, medium and long-term strategies were conceived to supply water to all effectees. The strategies embrace, energization of 101-installed tubewell and operationalization of 321 existing WSS. Rehabilitation, renovation, extension and upgradation of 142 rural and township schemes, development of new water resources and construction of 263 new WSS. To augment the Quetta WSS, installation of 100 new tubewells are proposed in Karstic and Hard Rock aquifers. An estimated amount of Rs.1,473.0 million and US$ 14.56 million proposed to invest on drought related water supply packages. The program will help to provide drinking and domestic water facilities to an additional population of about 0.9 million. To fulfill the domestic and industrial water demands of present and future generations, proper management of water resources is indispensable.