Irrigated agriculture is the mainstay of the economy of Pakistan. The irrigation and drainage system is the lifeline for irrigated agriculture in Pakistan, which is deteriorating due to poor discipline in design, construction and O&M of the system. The sustainability of the irrigated agriculture is threatened both by the waterlogging and salinity. During 1960s, a number of Salinity Control and Reclamation Projects (SCARPs) were initiated to address the problems of water logging and salinity. The SCARPs generally helped in checking the waterlogging and salinity. Due to their high O&M cost of the public tubewells in Fresh Ground Water (FGW) areas, the tubewells have been transitioned and farmers community encouraged to install small capacity tubewells and these are effectively taking care of the drainage needs of the area. The first phase of National Drainage Program (NDP-I) was conceived and planned as an instrument and first step towards setting the stage for introducing institutional and Policy Refonrns, in addition to the Investment Component for physical improvement of drainage network. The estimated cost of NDP-I was $ 785 million and it was implemented with the financial assistance of the World Bank ($ 285 million), Asian Development Bank ($ 140 million) and OECF of Japan ($ 100 million) in 6Y2 years (1997-2003). The Investment Component under NDP4 financed new schemes, rehabilitation and modernization of Off farm drainage, modernization of canal commands and O&M of drainage projects through performance contacts. The Federal Government, through WAPDA's Water Wing, had overall responsibility for implementing the project, while Provincial Irrigation/ Agriculture Department and Farmers Organizations were responsible for implementation of selected projects. The overall rating of NDP-I is not considered very successful. The Left Bank Outfall Drain (LBOD Project) as a part of NDP-1 is located along the left bank of River Indus in the command of Sukkur and Kotri Barrages in Sindh Province and serves an area of about 1.2 million acres in the districts of Nawabshah (now Shaheed Benazirabad), Sanghar, Mirpur Khas and Badin. The LBOD Main Drain is 250 km long with outfall capacity of 4000 cusecs (113m3/sec). The overall objective of the project was to control the twin menace of water logging and salinity and supplement present irrigation supply by remodeling of existing irrigation system. In addition, the Chotiari Reservoir was constructed to store excess water during low demand season and to release later during periods of high demand. This project was started in July, 1985 and completed in December, 2003 at an estimated cost of RS 33743 million. The original cost of the project sanctioned in August, 1984 was Rs.8593.52 million. The average annual O&M cost of the project ranges from Rs.650 million to Rs.700 million. It was an open ended project with very heavy costs and time over runs. An interest paid during construction was about Rs.6248 million which is roughly one fifth of the project cost which is unprecedented for such like development projects. The environmental and socio-economic safeguards were not protected along the areas especially at the level of outfall structure. The LBOD project of main drain immediately after its completion in 1998 has brought disaster to life and public property and misery to the people of LBOD command area. During 2011 monsoon unprecedented rainfall in the lower Sindh, five districts of theSindhProvince were completely submerged with depth of rainwater ranging from 4 to 8 feet. The objective of this paper is to document the lessons learnt of LBOD project. The Government of Pakistan must claim compensation from the concerned donors because of defective planning, faulty design and bad construction of the&am