Effect of Time Extension on Construction Projects in Pakistan: Comparison between Public and Private Projects in Khyber Pakhtunkhwa Pakistan

Author(s)
Muhammad Muaz Khan Department of Civil Engineering, Superior University Lahore, Pakistan
Muhammad Ammar Khan Department of Physical and Numerical Sciences, Qurtuba University of Science & Information Technology, D. I. Khan, Pakistan.
Mohammad Afaque Department of Civil Engineering, Babu Banarasi Das University Lucknow, India.
Bilal Ahmad Department of Electrical Engineering, University of Poonch Rawalakot, AJK, Pakistan
Abstract
This research scrutinized the effect of time extension on construction projects which is pivotal for Pakistan. This research work identified the ten main factors, and the ninety-five sub delay factors applied to different techniques such as RII (Relative Importance Index) method, AI (Average Index) method, and the Pareto chart method. In this work, we have analyzed the data and delineated a questionnaire for the survey to collect the opinion in the different construction industries through 70 valid responses. We have also found the most effective reasons for delaying in the construction industry and recommended some key factors for the different construction industry groups to control or avoid the time extension. This work helps the construction industry to control delays in projects.
Publication Details
Page(s) 14-33
DOI DOI not available
Published Journal: The Sciencetech, Volume: 2, Issue: 3, Year: 2021

Request the full text from PASTIC

Keywords
Construction Projects, RII, time extension, delaying causes, AI
References
Abdellatif H.,Alshibani A. .2019 .Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia. Buildings, 9(4) : 93.
Adegoke B. F.,Babatunde L. A.,Apata C. O.,Ogunyemi C. O.,Rule Pareto .2017 .A Guide in Testing Accuracy of Cost Estimating of Residential Buildings in Nigeria. The Use of, 2(43) : 330-340.
Ali W.,Shao J.,Khan A. A.,Tumrani S. .2019 .Context-Aware Effect of Time Extension on Construction Projects Muaz. Bilal Recommender Systems: Challenges and Opportunities. Dianzi Keji Daxue Xuebao/Journal of the University of Electronic Science and Technology of China, 48(5) : 655-673.
Ali W.,Tian W.,Din S. U.,Iradukunda D.,Khan A. A. .2021 .Classical and modern face recognition approaches: a complete review. Multimedia Tools and Applications, 80(3) : 4825-4880.
Amri T,Marey-Pérez M. .2020 .Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman. Journal of Project Management, : 87-102.
Banobi E. T.,Jung W. .2019 .Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects. , 11(21) : 1-16.
Biruk S.,Jaśkowski P. .2020 .Selection of the Optimal Actions for Crashing Processes Duration to Increase the Robustness of Construction Schedules. Applied Sciences, 10(22) : 8028.
Bitamba B. F.,An S.-H. .2020 .Construction Project Change Management in the Democratic Republic of the Congo: Status, Causes, and Impacts. Sustainability, 12(22) : 9766.
Blackman I.,Chan E. .2013 .Using Pareto Principle plus statistic methodology in establishing a cost estimating model. , : .
Elhusseiny H. O.,Nosair I.,Ezeldin A. S. .2021 .Systematic processing framework for analyzing the factors of construction projects' delays in Egypt. Ain Shams Engineering Journal, 12(2) : 1501-1511.
Hamooni M.,Maghrebi M.,Sardroud J. M.,Kim S. .2020 .Extending BIM Interoperability for Real-Time Concrete Formwork Process Monitoring. Applied Sciences, 1085(3) : 1085.
Herrera R. F.,Sánchez O.,Castañeda K.,Porras H. .2020 .Cost Overrun Causative Factors in Road Infrastructure Projects: A Frequency and Importance Analysis. Applied Sciences, 10(16) : 5506.
Karunakaran S.,Malek M. A.,Ramli M. Z. .2019 .Causes of Delay in Construction of Highway Projects: a Review. International Journal of Civil Engineering and Technology, 10(02) : 2374-2386.
Kassa Y. F.,Ababa A.,Escalations Cost .2018 .Department of Public Administration and Development Management Determinants of Infrastructure Project Delays. The Case of Road and Rail Construction Projects in Ethiopia, 63(1) : 102-136.
Khalifa W. M. A.,Mahamid I. .2019 .Causes of Change Orders in Effect of Time Extension on Construction Projects Muaz. , 9(6) : 4956-4961.
Khatib B.,Al B.,Poh Y. S.,El-Shafie A. .2018 .. Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project. Sustainability, 10(12) : 4772.
Kumar V. .2020 .Delay in Construction of Highway and Expressway Projects. International Research Journal of Engineering and Technology, 7(6) : 2136-2142.
Okpala D. C.,Aniekwu A. N. .1988 .Causes of High Costs of Construction in Nigeria. Journal of Construction Engineering and Management, 114(2) : 233-244.
Pall G. K.,Bridge A. J.,Gray J.,Skitmore M. .2019 .Causes of delay in power transmission projects: An empirical study. Energies, 13(1) : .
Paraskevopoulou C.,Boutsis G.,Page 73 .2020 .Cost Overruns in Tunnelling Projects: Investigating the Impact of Geological and Geotechnical Uncertainty Using Case Studies. Infrastructures, 5(9) : 73.
Rashid Y. .2020 .Analysis of delay factors and their effects on construction projects. Management Science Letters, 10(6) : 1197-1204.
Rivera L.,Baguec H.,Yeom C.,Page 84 .2020 .A Study on Causes of Delay in Road Construction Projects across 25 Developing Countries. Infrastructures, 5(10) : 84.
Safapour E.,Kermanshachi S.,Alfasi B.,Akhavian R. .2019 .Identification of Schedule-Performance Indicators and DelayRecovery Strategies for Low-Cost Housing Projects. , 11(21) : 1-13.
Sepasgozar S. M. E.,Karimi R.,Shirowzhan S.,Mojtahedi M.,Ebrahimzadeh S.,McCarthy D.,Page 191 .2019 .Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK. Buildings, 9(9) : 191.
Soomro F. A.,Memon M. J.,Chandio A. F.,Sohu S.,Soomro R. .2019 .Causes of Time Overrun in Construction of Building Projects in Pakistan. , 9(1) : 3762-3764.