No Detail Found!

Revamping turbo-machinery in ammonia/urea plants for enhancing production output and energy efficiency.

Author(s)
Valter Quercioli GE Infrastructure, Oil & Gas, Firenze, Italy
Abstract
Revamping an ammonia/urea plant is needed whenever management needs improvements on plant availability, production output, energy consumption or lie extension, to quote the most common needs. The achievements of those objectives are reached through programs known as “modernization”, “rejuvenation”, compression trains, especially syngas, are a key part of those programs to achieve the business and operations objectives defined by management. This paper is aimed to show how a revamping program works for compression trains and on real-life example is shown.
Publication Details
Page(s) 8-10
DOI DOI not available
Published Journal: Engineering horizons, Volume: 19, Issue: 1, Year: 2006

Request the full text from PASTIC

0

Citations

0

Downloads

25

Views