Electricity is one of the most important constituent of infrastructure component which plays a key role in national growth and development. With only half of population having access to electricity, a huge population base provides an ideal opportunity for expansion of electricity generation. The growing pace of urbanization and industrialization also puts a premium on demand for electricity. Previously ratio of Hydel: Thermal generation was 70:30 and 100% generation was in public sector. The previous power policy of 1998, however, had failed to attract the private power investors. The Government felt it necessary to create an environment and craft a new set of incentives which, on the one hand, offer attraction to investors and, on the other, keep the consumer prices within affordable limits. Keeping in view these targets, Latest Policy for Power Generation 2002 has been brought out after thorough deliberation and brain-storming among all stakeholders over a period of above two-and –half years. This policy offers maximum incentives and assurances that investors can expect. Unfortunately, the hydel generation in the country has not increased sufficiently. The inclusion of bulk hydel generation is still not foreseen in near future till large dams such as Kalabagh and Basha are constructed. Best economical options are Coal and Nuclear power generation but both have their own constraints and involve more time for construction. To optimize the cost of electricity production under present scenario when our hydel potential is not properly utilized and coal resources are not discovered as per requirement according to the Latest Pakistan Power Policy. The power demand gap can conveniently be fulfilled with the installation of Combined Cycle Power Plants based on Gas, FO/HSD as backup fuel. FO (Furnace Oil) HSD (High Speed Diesel). This is a short term scenario but for long term power requirements must be fulfilled by installation of new Hydel, Nuclear and Coal based plants so that economical energy mix can be achieved.