Gun barrel manufacturing represents a single item/ single product with multiple processing in hybrid production system. To economize the investment in technology acquisition, significant backtracking occurs on the flow-line like system. The paper investigates the impact of production volume, alternate process routings and simultaneous loading of gun barrels at heat treatment facility. Average cycle time of the system is selected as response variable. Experimental design is based on 3-Factor multi-level full factorial methodology to investigate best case and worst case desirability in terms of the cycle time. It seems that large production volumes with well defined specific type of process sequencing combined with a multitude of simultaneous loadings at HT facility has significant impact on productivity of the system. The paper proposes an analysis approach based on best case and worst case scenarios. In particular, specifying a worst case analyses methodology identifies scenarios to emphasize risk averse decision making as well.