No Detail Found!

Flash flood forecasting system for Lai Nullah Basin (A case study of March 19, 2007 rainfall event).

Author(s)
Azmat Hayat Pakistan Meteorological Department, Islamabad, Pakistan
Abstract
Two to six hours convective storm nowcasting hydro-meteorological model MIKE 11 is currently in use at the National Weather Forecasting Centre Islamabad for providing pre-alerts and warnings from flash floods in local stream known as Lai Nullah. Forecasters use this regularly updated (every 10 minutes), automated weather product as guidance in anticipating flash flood hazards for the stream. This system, which combines runoff and point rainfall recorded data, produces 2 to 6 hour precipitation rate and accumulation forecasts every 10 minutes for both meteorological and hydrological purposes; accurate warning for flash floods are a primary goal in the use of this tool. On 20th March 2007, after 5 hours of intermitant showers from 2200 (19th Mar) till 0300 PST 20th morning, the system intensified and produced heavy rainfall over the catchments of the local stream termed as Lai Nullah. Consequently, the stream rose to alert level and necessary warnings were issued. The model reported corresponding alerts well and confidence on the system was established.
Publication Details
Page(s) 75-84
DOI DOI not available
Published Journal: Pakistan Journal of Meterology, Volume: 4, Issue: 7, Year: 2007

Request the full text from PASTIC

0

Citations

0

Downloads

39

Views