Maria J. R.,Jan M.,Gernot S.,Erik S.,Rob P.,Jonas B.,David R,Timmy A. R .2020 .The next normal in construction How disruption is reshaping the world's largest ecosystem. McKinsey & Company June, : .
Boton Gilles. .2015 .. The Challenge of Level of Development in 4D/BIM Simulation Across AEC Project Lifecyle. A Case Study. Procedia Engineering, 123 : 59-67.
Sloot R.N.F.,Heutink A.,Voordijk J.T. .2019 .Assessing usefulness of 4D BIM tools in risk mitigation strategies. , 106 : 102881.
Crowther James,Saheed O. Ajayi James .2021 .Impacts of 4D BIM on construction project performance. International Journal of Construction Management, 21(7) : 724-737.
Jin Vineeth. .2019 .Using 4D BIM to assess construction risks during the design phase. Engineering Construction & Architectural Management, 26 : 2637-2654.
Faris E.,Sepehr A. .2020 .Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3) : 401-420.
Peter S. .2016 .Project cost management with 5D BIM. , 226 : 193-200.
Amjed N.,Sawsan M. .2019 .The Benefits of and Challenges to Implement 5D BIM in Construction Industry. Civil Engineering Journal, 5(2) : .
Kehily D,Underwood J .2017 .Embedding life cycle costing in 5D BIM. , 22 : 145-167.
Tochukwu M.,David H.,David O H. .2020 .Implementing 5D BIM on construction projects: contractor perspectives from the UK construction sector. , 18(6) : 1867-1888.
C. Bob T.,Thomas K .1999 .MEP Coordination in Building and Industrial Projects, center for integrated facility engineering 54.. , : .
Ahmad J.,Julien L. .2015 .An Integrated BIM System to Track the Time and Cost of Construction Projects: A Case Study. Journal of Construction Engineering, 579486 : .
Tetsuya M. .1997 .Construction manageability planning - A system for manageability analysis in construction planning. International Symposium on Automation and Robotics in Construction, 6(3) : 175-191.
Faris E.,Sepehr A.,M. Reza H.,Soliman A.,Mark G. .2019 .Integrated project delivery with BIM: An automated EVM-based approach. , 106 : 102907.
Russell K.,Toby H. .2015 .Construction Project Control Methodologies And Productivity Improvement: EVM, BIM, LBM. , 10 : .
C. Cárdenas P.,Zapata N.,Lozano N. .2018 .Building Information Modeling 5D and Earned Value Management methodologies integration through a computational tool. , 33(3) : 263-278.
Park S.,Inhan K. .2015 ."BIM-Based Quality Control for Safety Issues in the Design and Construction Phases." Archnet-IJAR:. International Journal of Architectural Research, 9(3) : 111-129.
Choi J.,Lee S.,Kim I. .2020 .Development of Quality Control Requirements for Improving the Quality of Architectural Design Based on BIM. Applied Sciences, 10(20) : 7074.
Amin A.,Mehrdad A.,Heng L.,Tuan N.,Alireza B.,Ali R. .2020 .Sensor-based safety management. Automation in Construction, 113 : 103128.
Reinbold A.,Seppänen O.,Peltokorpi A.,Singh V.,Dror E. .2019 .(Annual Conference of the International Group for Lean Construction). International Group for Lean Construction (IGLC)., : 1141-1150.
Hong Y.,Chen W.,Z. W. .2018 .Developing a Quality-Embedded EVM Tool to Facilitate the Iron Triangle in Architectural, Construction, and Engineering Practices. Journal of Construction Engineering and Management, 144 : .
Project Management . .Institute (PMI). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) (4th ed. PMI Publications., : .