Post Venture Examination and Environmental Impact Assessment (EIA) Report Survey of a Multistory Building

Author(s)
Muhammad Abbas Khan Technical Education and Vocational Training Authority (TEVTA), Khyber Pakhtunkhwa, Pakistan
Aliza Qayyum University of Engineering and Technology (UET), Taxila, Pakistan
Saad Zaheer Centre of Excellence in Water Resources Engineering, University of Engineering and Technology (UET), Lahore, Pakistan, Civil Engineering Department, Bahauddin Zakariya University, Multan, Pakistan
Sharafat Ali Darban Quaid-e-Awam University of Engineering Science and Technology, Nawabshah, Pakistan
Asif Ali Quaid-e-Awam University of Engineering Science and Technology, Nawabshah, Pakistan
Murad Khan School of Civil Engineering, Tianjin University, Tianjin
Abstract
In recent years, high-rise buildings have been constructed as an urban development strategy in many megacities. High-rise buildings have positive as well as negative impacts on urban environments. Therefore, the postproject analysis and review (PPA) of environmental impact assessments (EIA) of high-rise buildings should be performed to establish strategies to ensure sustainable and resilient urban development is essential. This study involves the Post Project Analysis and Review (PPA) of the EIA report for the complex "The Centaurus". The Centaurus has been in operation for ten years, a PPA&R of impact is required, as predicted. It must be emphasized that the PPA needs to analyze the environmental factors selected in the EIA report. Furthermore, the proposed improvement measures must be implemented. A few impacts were chosen that could be easily carried out. Operational-related impacts were selected which include traffic, parking, the concentration of carbon monoxide in an enclosed parking garage, building shadow, etc. Preliminary and Secondary data were collected. Several visits were made for the collection of data through literature review, questionnaires, interviews, and Instruments while the data was analyzed by MS Excel. The study concluded that the project had been altered from its original scope and that this had caused traffic, parking problems, and carbon monoxide concentrations in parking lots.
Publication Details
Page(s) 620-634
Published Journal: International Journal of Membrane Science and Technology, Volume: 11, Issue: 1, Year: 2024

Request the full text from PASTIC

Keywords
Post-Project-Analysis in, Post-Project-Analysis (PPA), Environmental Impact Assessment (EIA)
References
Dendena B.,Corsi S. .2015 .The Environmental and Social Impact Assessment: a further step towards an integrated assessment process. Journal of cleaner production, 108 : 965-977.
Enríquez-de-Salamanca Á. .2021 .Simplified environmental impact assessment processes: review and implementation proposals. Environmental Impact Assessment Review, 90 : 106640.
Kalantari S.,Shepley M. .2021 .Psychological and social impacts of high-rise buildings: A review of the post-occupancy evaluation literature. Housing studies, 36(8) : 1147-1176.
Piracha A.,Chaudhary M. T. .2022 .Urban air pollution, urban heat island and human health: a review of the literature. Sustainability, 14(15) : 9234.
Fischenich J. C.,Miller S. J.,LoSchiavo A. J. .2019 .A systems approach to ecosystem adaptive management: a USACE technical guide. , : .
Roche C.,Brueckner M.,Walim N.,Sindana H.,John E. .2021 .Understanding why impact assessment fails; a case study of theory and practice from Wafi-Golpu, Papua New Guinea. Environmental Impact Assessment Review, 89 : 106582.
Barrow C. J. .2010 .How is environmental conflict addressed by SIA?. Environmental Impact Assessment Review, 30(5) : 293-301.
Barros P.,Fat L. N.,Garcia L. M.,Slovic A. D.,Thomopoulos A. D.,de Sa A. D.,Mindell J. S. .2019 .Social consequences and mental health outcomes of living in high-rise residential buildings and the influence of planning, urban design and architectural decisions: A systematic review. Cities, 93 : 263-272.
Beatley T.,Manning K. .2013 .The ecology of place: Planning for environment, economy, and community. , : .
Kalcheva E.,Taki A.,Hadi Y. .2016 .Sustainable high-rises in a sustainable development-the case of Salford Quays. Procedia-Social and Behavioral Sciences, 216 : 960-973.
Levy R. J. .2015 .Carbon monoxide pollution and neurodevelopment: a public health concern. Neurotoxicology and teratology, 49 : 31-40.
Enríquez-de-Salamanca Á. .2021 .Simplified environmental impact assessment processes: review and implementation proposals. Environmental Impact Assessment Review, 90 : 106640.
Morgan R. K. .2012 .Environmental impact assessment: the state of the art. Impact assessment and project appraisal, 30(1) : 5-14.
Gangolells M.,Casals M.,Gassó S.,Forcada N.,Roca X.,Fuertes A. .2009 .A methodology for predicting the severity of environmental impacts related to the construction process of residential buildings. building and Environment, 44(3) : 558-571.
Glasson J. .2022 .Follow-up: post-decision learning in EIA. In Handbook of Environmental Impact Assessment, : 198-218.
Anbari F. T.,Carayannis E. G.,Voetsch R. J. .2008 .Post-project reviews as a key project management competence. Technovation, 28(10) : 633-643.
Carrillo P.,Harding J.,Choudhary A. .2011 .Knowledge discovery from post-project reviews. Construction Management and Economics, 29(7) : 713-723.
Koners U.,Goffin K. .2007 .Learning from postproject reviews: A cross‐case analysis. Journal of Product Innovation Management, 24(3) : 242-258.
Nicolaisen M. S.,Driscoll P. A. .2016 .An international review of ex-post project evaluation schemes in the transport sector. Journal of Environmental Assessment Policy and Management, 18(01) : 1650008.
Silvius A. J.,Schipper R. P. .2014 .Sustainability in project management: A literature review and impact analysis. Social business, 4(1) : 63-96.
. .. , : 3745.
0

Citations

0

Downloads

65

Views