No Detail Found!

Simulation based analysis of single unit and parallel connected three phase AC generators in QUEST campus Larkana

Author(s)
Abdul Hameed Soomro Department of Electrical Engineering, Quaid-e-Awam University of Engineering Science and Technology Nawabshah Campus Larkana,Sindh,Pakistan
Syed Abid Ali Shah Department of Electrical Engineering, Quaid-e-Awam University of Engineering Science and Technology Nawabshah Campus Larkana,Sindh,Pakistan
AssadUllah Khauhwar Department of Electrical Engineering, Quaid-e-Awam University of Engineering Science and Technology Nawabshah Campus Larkana,Sindh,Pakistan
SanaUllah Talani Department of Electrical Engineering, Quaid-e-Awam University of Engineering Science and Technology Nawabshah Campus Larkana,Sindh,Pakistan
Aijaz Ahmed Solangi Department of Electrical Engineering, Quaid-e-Awam University of Engineering Science and Technology Nawabshah Campus Larkana,Sindh,Pakistan
Talha Soomro Department of Electrical Engineering, Quaid-e-Awam University of Engineering Science and Technology Nawabshah Campus Larkana,Sindh,Pakistan
Faraz Ali Khushk Department of Electrical Engineering, Quaid-e-Awam University of Engineering Science and Technology Nawabshah Campus Larkana,Sindh,Pakistan
Abstract
Recently power crises are increasing day by day in Pakistan due to a shortage of energy resources. The financial position of Pakistan is too weak and is not in a position to install new power projects for the production of electrical power to meet the demand as per requirement. Every consumer is trying to install the power-producing devices to meet the demand in order to run their institutional laboratories, offices, commercial plants, and industrial machines. Electricity for resident people of villages of Pakistan is not sufficient to run their home appliances and mostly solar systems has installed to meet the requirement in day time but in night time energy storage system is required, so cost will be increased and less illumination is received at night time. The generator is also one of the power producer devices to meet the consumers' demand to supply the electrical power to the load in absence of failure of power supply from utility companies. A single large unit is very expensive to run the small loads and consumes large amounts of fuel, so the parallel connection of two small generators is very beneficial to meet the demand as per requirement, resulting in cost savings, and less fuel consumption. QUEST Campus Larkana has installed two 50KVA generators in parallel to supply the required power to the load in absence of a power supply to run their offices, workshops and laboratories, this minimizes the cost, and increases the reliability of the system. The MATLAB simulation model is developed to analyze the performance of the single unit generator and parallel connected generators.
Publication Details
Page(s) 33-41
DOI DOI not available
Published Journal: Sukkur IBA Journal of Emerging Technologies (SJET), Volume: 5, Issue: 2, Year: 2022

Request the full text from PASTIC

Keywords
AC Generators, Power Supply