The use of statistical quality control charts in monitoring the cost and project duration of a columbarium construction project utilizing concrete composite panels

Author(s)
Adolph Vincent E. Vigor University of Science and Technology of Southern Philippines, Cagayan de Oro City, Philippines
Jonathan B. Calibara University of Science and Technology of Southern Philippines, Cagayan de Oro City, Philippines
Lloyd Jhon B. Estampa University of Science and Technology of Southern Philippines, Cagayan de Oro City, Philippines
Ninia Marie A. Estillore University of Science and Technology of Southern Philippines, Cagayan de Oro City, Philippines; Cugman National High School, Cugman, Cagayan de Oro City, Philippines
Consorcio S. Namoco University of Science and Technology of Southern Philippines, Cagayan de Oro City, Philippines
Abstract
Earned value (EV) is a popular method for monitoring and analyzing a project's performance and progress. In this study, the EV indices are used with Statistical Quality Control Charts to monitor the cost and schedule of a columbarium building project. As a result, the Earned Value has increased in value during the last nine (9) weeks. From week 2 through week 9, the construction project's Schedule Performance Index (SPI) and Cost Performance Index (CPI) are both greater than one. The assessment found that more work was accomplished than anticipated, and the project's actual cost did not exceed the projected cost. The study indicated that EV indices and SQC charts were effective tools for project monitoring.
Publication Details
Page(s) 349-353
DOI DOI not available
Published Journal: Science International, Volume: 34, Issue: 4, Year: 2022

Request the full text from PASTIC

Keywords
control chart, Statistical Quality Control, Earned Value Method, Schedule Performance Index, Cost Performance Index