No Detail Found!

Short Circuit Analysis of EHT Network and Solutions for De-Rated Equipment

Author(s)
Muhammad Ibrar-ul-Haque Department of Electrical Engineering, Sir Syed University of Engineering & Technology, Karachi, Pakistan
Usama Ahmed Department of Electrical Engineering, Sir Syed University of Engineering & Technology, Karachi, Pakistan.
Sana Anwar Department of Electrical Engineering, Sir Syed University of Engineering & Technology, Karachi, Pakistan
Umm-e-Laila Department of Computer Engineering, Sir Syed University of Engineering & Technology, Karachi, Pakistan.
Shakeel Ahmed Khan Department of Electrical Engineering, Sir Syed University of Engineering & Technology, Karachi, Pakistan
Abstract
In any power system, load growth occurs due to increase in various activities including industrial expansion, infrastructure development, population growth etc. To meet power demand, the electrical network of utility company required addition in transmission lines, grid stations and power generation. The heavy current that flows due to short circuits causes different types of internal and external faults on the power system which may damage the equipment in the grid station if the fault is not cleared in time. The equipment in the grid station must have the capability to withstand the heavy short circuit level. If unusually high currents exceed the capability of protective devices in the power system, a short-circuit can cause the devices to explode like a bomb, which may ultimately result in collapse of entire system leading to brown out or black out. All these expansion leads to increase in short circuit levels. The short circuit current passes the high voltage, network equipment including circuit breakers, disconnectors, current transformers, potential transformers, surge arresters etc. The high voltage equipment's need to be check due to increase in short circuit current due to addition in power plants, auto transformers, power transformers and transmission lines. The equipment's that are already installed are required to withstand short circuit at all time. In the presented work, short circuit levels are calculated by using a software ETAP (Electrical Transient Analysis Program), followed with the analysis of existing equipment's as whether it can withstand the short circuit level. The proposed period of study is set to be 5 years (till year 2023). Furthermore, three different types of solutions are provided for the derating equipment in the K- electric 220Vand 132KVtransmission lines
Publication Details
Page(s) 46-50
DOI DOI not available
Published Journal: New Horizons: Journal of the Institution of Electrical & Electronics Engineers Pakistan, Volume: 101, Issue: 1,2, Year: 2019

Request the full text from PASTIC

Keywords
Faults in Power System, Black Out., Syste nalysis, Short Circuit Level, Load Growth, rotective Devices, Electrical Transient Analysis Program, Power Demand
0

Citations

0

Downloads

33

Views