No Detail Found!

Evaluation of sediment flushing feasibility of small reservoirs in potohar plateau of pakistan

Author(s)
P. Akhtar Department of Physics, Govt. Degree College for Women,Shah Rukn-e-Alam, Multan,Pakistan
J. Ahmad Department of Physics, Bahauddin Zakariya University,Multan,Pakistan
M. U. Rashid Civil Engineering Department, University of Management & Technology,Lahore,Pakistan
A. Latif Civil Engineering Department, Bahauddin Zakariya University, Multan, Pakistan
T. Sultan Civil Engineering Department, Bahauddin Zakariya University, Multan, Pakistan
M. A. Ali NFC Institute of Engineering and Technology,Multan,Pakistan
R. Farooq Department of Civil Engineering, International Islamic University,Islamabad,Pakistan
A. Bachaya Department of Civil Engineering, Quaid-e-Azam College of Engineering and Technology,Sahiwal,Pakistan
M. K. A. Khan Irrigation Department,Punjab,Pakistan
Abstract
There are more than about 25000 dams world-wide having volume above 6400 billion cubic meter exceed about. Whereas the storage quantum for the dams is reducing drastically due to unhealthy distribution of silt charge in the flowing water and sediment-deposition. The study was performed to investigate the impact of the application of Atkinson's Methods of storage conservation of small dams. Real time application of such methods has been exercised on small dams in Punjab Pakistan to conserve their storage life. The process of flushing using the low level built in outlets were developed for clearing the storage from sedimentation at large scales. A total of 62 dams in Potohar Plateau of Punjab were initially considered, however the above said techniques have been applied on only 33 dams. The data was collected from Small Dams Organization and Irrigation Department of Punjab, Punjab, Pakistan. Statistical indices including Sedimentation Balancing Ratio (S.B.R), Drawing downed Ratio (D.D.R), Long Term Capacity Ratio (L.T.C.R or LTCR), Fully Drawing downed for Sedimentation Balancing Ratio (S.B.Rd), Flushed reservoir Width Ratio (F.W.R) and Top of reservoir Width Ratio (T.W.R) have been used to assess the flushing impacts. The results of study revealed that only seven reservoirs have successfully been flushed in a certain time period.
Publication Details
Page(s) 23-38
DOI DOI not available
Published Journal: Technical Journal, Volume: 26, Issue: 1, Year: 2021

Request the full text from PASTIC

Keywords
small dams/ reservoirs, flushing evaluation / feasibilty, Sediment flushing
0

Citations

0

Downloads

54

Views