CONSTRUCTION STAGE ANALYSIS OF SEGMENTAL BOX GIRDER BRIDGE

Author(s)
S. Abbas Department of Civil Engineering, University of Engineering and Technology Lahore, Pakistan
A. Hameed Department of Civil Engineering, University of Engineering and Technology Lahore, Pakistan
A.U. Qazi Department of Civil Engineering, University of Engineering and Technology Lahore, Pakistan
R. Nazir Department of Civil Engineering, University of Engineering and Technology Lahore, Pakistan
Abstract
Segmental bridge construction is very common in Pakistan. However, the impact of structural system changes before and after the completion of segmental bridge construction is a challenge and major concern for construction stakeholders. Therefore, in this study, construction stage analysis was performed for balanced cantilever construction technique to check the safety and serviceability of the bridge. Through time dependent analysis, considering the construction sequence and creep deformation of concrete, structural responses related to the member forces were reviewed. Moment reversal was observed in the cantilever segments near the face of the pier. Therefore, maximum compressive and tensile stresses were observed in the top and bottom fibers of the girder, respectively. These stresses were within the AASHTO LRFD limits for construction stage loads. Results demonstrated that the creep moment redistribution started when the structural system changed from statically determinate to indeterminate stage. Furthermore, it was concluded that the time dependent deformation of concrete was the governing factor in order to achieve the final design moments.
Publication Details
Page(s) 453-461
DOI DOI not available
Published Journal: Pakistan Journal of Science, Volume: 68, Issue: 4, Year: 2016

Request the full text from PASTIC

Keywords
Segmental bridge construction, balanced cantilever, time dependent analysis, creep deformation