OPTIMAL ENERGY SAVING FOR MOTORWAY M-2 USING UNRELIABLE GRID TIED- PV DIESEL HYBRID DESIGN SYSTEM

Author(s)
M.A. Qaisrani Electrical Engineering Department, The Superior College Lahore, Lahore, Pakistan
M. Elahi Electrical Engineering Department, The Superior College Lahore, Lahore, Pakistan
G. Abbas Electrical Engineering Department, The University of Lahore, Lahore, Pakistan
A. Raza Electrical Engineering Department, The University of Lahore, Lahore, Pakistan
H. Abid Electrical Engineering Department, The Superior College Lahore, Lahore 54000, Pakistan
Abstract
Pakistan, as a developing country is facing serious challenges of energy crises since the last decade due to growth in demand of energy day by day and lack of investment in the appropriate utilization of available energy resources. Due to the adverse environmental impact of Diesel Generators and like Greenhouse Gases (GHG) emission and declining the prices of solar panels, Renewable Energy Resources (RERs) are being increasingly executed due to their eco-friendly, least global warming emissions (GWE) and its least maintenance cost. The research is a study on integration of solar PV generation into the existing unreliable grid-connected system with diesel generators at Motorway Service Area (MSA) Bhera, Punjab, Pakistan. The main objective is an implementation of on-grid photovoltaic-diesel generators hybrid power system to minimize the Net Present Cost (NPC) and Cost of Energy (COE) along with reduction in emission of GHG and the import of fossil fuel used in generation of electricity. Comprehensive economic, technical and environmental analysis is performed through Hybrid Optimization Model for Electric Renewables (HOMER) with five different design systems starting from existing unreliable grid with one large rating diesel generator and later on integration of PV into existing system. NPC and COE are least in proposed system as compared to four other design hybrid systems. NPC and COE of proposed PV-DGs-Grid system are 2.07 M$ and 0.168 $/KWh, respectively with payback period of seven years over the life span of 25-year project. The proposed system is eco-friendly and saves 33% CO2, 41% CO and 47% Nitrogen Oxides as compared to existing system. The proposed system is implementable on all sites of Motorways in the country with little variation in the design keeping in view the required demand for energy.
Publication Details
Page(s) 21-29
DOI DOI not available
Published Journal: Pakistan Journal of Science, Volume: 71, Issue: 4S, Year: 2019

Request the full text from PASTIC

Keywords
global warming, Photovoltaic, greenhouse gases, hybrid system, Unreliable Grid, Diesel Generator (DG)