Private power and Infrastructure Board,
Ministry of Water and Power, Govt of Pakistan,
Pakistan Coal Power Generation Potentials.
2004
Mahmood A, Javaid N, Zafar A, Riaz RA, Ahmed S, Razzaq S. (2014). Pakistan`s
overall energy potential assessment, comparison of LNG, TAPI and IPI gas projects.
Renewable and sustainable energy reviews. 31: 182-193
Z zixiong,Z Yanli,H Feng,J, 2012., 1 241 -252
Satti SL, Hassan MS, Mahmood H, Shahbaz M. Coal consumption: An alternate energy resource to fuel economic growth in Pakistan.
(2014). Economic Modelling. 36:282-287
TesarikDR,SeymourJB,YanskeTR, 2009.Waste-filling in fully-mechanized coal mining and its application,J China Univ of Mining and Technology 18 0479 -0482
Systematic Selection and Application of Backfill in underground Mines,International J. of Rock Mechanics and Mining Science 46 1182 -1196-2009
GhasemiE,AtaeiM,ShahriarK,SereshkiF,JalaliSE,ZadehAR,ZhangJ,ZhangQ.,B , Deng,K Z , Zhang,L Y.,LiH Q,XiangL,ChenS G., 2011.Mechanical analysis on the gob with room and pillar mines and its evaluation system,Safety in Coal Mines. 42 136 -139
Xie-xing M, Ji-xiong Z, Mei-mei F. (2008).
Waste-filling in fully-mechanized coal mining
and its application. J China Univ of Mining and
Technology. 18:0479-0482
Tesarik DR, Seymour JB, Yanske TR. (2009).
Long term stability of a backfilled room-andpillar
test section at Buick Mine, Missouri, USA.
International J. of Rock Mechanics and Mining
Science. 46:1182-1196
Dr-Inq. (2009). Systematic Selection and
Application of Backfill in underground Mines.
Institute of Mining and Special Civil
Engineering, TU Bergakademie Freiberg,
Germany
Ghasemi E, Ataei M, Shahriar K, Sereshki F,
Jalali SE, Zadeh AR. (2012). Assessment of
roof fall risk during retreat mining in room and
pillar coal mines. International J. of Rock
Mechanics and Mining Science. 54: 80-89
Feng Ju, Zhang J, Zhang Q. (2012). Vertical
transportation system of solid material for
backfilling coal mining technology. International
J. of Mining Science and Technology. 22(1):
41-45
Fu W B, Deng K Z, Zhang L Y. (2011). Analysis
on the stability of the pillar in gob with room and
pillar mines.Safety in Coal Mines. 42(1):136-139