No Detail Found!

Risk Management on Bot Scheme on Post Constructed Toll Roads.

Author(s)
P ARAVIND Department of Civil Engineering, SRM University, Kattankulathur, Kancheepuram District, Tamil Nadu, India
V.P GOLDA PERCY Department of Civil Engineering, SRM University, Kattankulathur, Kancheepuram District, Tamil Nadu, India
V VISALAN Department of Civil Engineering, SRM University, Kattankulathur, Kancheepuram District, Tamil Nadu, India
G SMRITHI Department of Civil Engineering, SRM University, Kattankulathur, Kancheepuram District, Tamil Nadu, India
A.M SNEHA Department of Civil Engineering, SRM University, Kattankulathur, Kancheepuram District, Tamil Nadu, India
Abstract
BOT (Build, Operate, Transfer) scheme means the government transfers the concession to private company where the company is responsible for building and operating the project, and transfers the project back to the government when the concession expires. This kind of BOT (Build, Operate, and Transfer) projects is currently fashionable worldwide. The important issues concerning a highway B-O-T project is the risk factors which have been involved on the post constructed toll roads. This paper deals with the factors on risk which have been involved on a constructed toll road. Different toll roads were considered. Risk identification and classification based on risk factors has been done on the toll roads. The risk parameters are measured by the collection of details from various experts from toll road projects. AHP (analytic hierarchy process) is used for analyzing the data to determine the risk factors and their impact at different stages in road project. The comparative study is made between city and highway toll roads where many differences in management of roads were obtained.
Publication Details
Page(s) 317-321
DOI DOI not available
Published Journal: Pakistan Journal of Biotechnology, Volume: 14, Issue: 3, Year: 2017

Request the full text from PASTIC

References
Nerija Banaitiene and Audrius Banaitis, Risk Management in construction projects. InTech, (2012).
Rinaj Pathan and S.S. Pimplikar, Risk assessment of BOT road projects. IOSR-JMCE 5(3): (2013).
Sharmila Mane and SS. Pimplikar, Risk assessment of BOT Projects. IJCER 3(8): 63-69 (2013).
Keith R. Molenaar, James E. Diekmann, David B. Ashley, Guide to risk assessment and allocation for high way construction management (2006).
Deepa Shri S., Thenmozhi R., Behaviour of Hybrid Ferro-cement Slabs Subjected to Impact. Journal of Structural Engineering 8(2): 65 -74 (2014)
0

Citations

0

Downloads

28

Views